image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image

PROJECT DESCRIPTION

Surface preparation on the deck area of “kilmourne” dredger located in Kilkeel.
Works included water blasting the entire deck area to a WJ2 standard. UHP machine running at 2000-2500 bar pressure to remove old paint and heavy rust in places.

Waterblasting Surface Preparation Standards

Click to view document.